All framing’s been corrected around desk nook; 1/2 walls and columns separating LR and sunroom are framed; electrical wiring’s been run, and the bathroom drains are roughed in.
Oct 06
Temporary steps up to porch
Desk nook framing has been adjusted
Half-walls with columns are framed
Looking down from loft
In sunroom, looking into LR
In sunroom, looking at LH 1/2 wall and column
Looking up from sunroom into loft
Fireplace is framed
Looking straight at fireplace
Looking straight into desk nook (outlets are wired)